What changed in 230.71

Clarified how service disconnects work in meter centers, transfer switches, and motor control centers, and added an allowance for existing equipment that met older editions.

Point by point

  • A service gets one disconnect, or up to six under 230.71(B), and each must be in its own enclosure, section, or compartment.

The full lesson is in the Pro Version

Get the whole breakdown

  • 4 more points on exactly what changed
  • The 2020 rule next to the 2023 rule, side by side
  • Why it changed
  • What to do and check on the job

One membership unlocks every NEC® change lesson for 2020, 2023 and 2026, plus every video, quiz, flashcard and the Testing Center.

Checking your membership…

This section across NEC® editions

2020 NEC®Revised

Up to six service disconnects are still allowed, but each now needs its own enclosure or separated section; six breakers in one panel no longer qualifies.

Open the 2020 page →
2023 NEC®RevisedYou're here

Clarified how service disconnects work in meter centers, transfer switches, and motor control centers, and added an allowance for existing equipment that met older editions.

2026 NEC®No change

This section did not change from 2023 to 2026.

More 2023 changes in Article 230

This is a plain-English summary, not the NEC®'s exact wording. Always check the full section in the NEC® edition your area has adopted, plus any local amendments.

NEC® and National Electrical Code® are registered trademarks of the National Fire Protection Association (NFPA). Electrical Exam Coach is not affiliated with or endorsed by NFPA.

Find it faster on test day

Get a code book that's already tabbed and highlighted.