705.11 Connections to a service
What changed in 705.11
Supply-side connections now list three allowed methods and treat the tap conductors as service conductors, with clear rules for sizing, splices, disconnects, bonding and overcurrent protection.
Point by point
- Allowed tie-ins: a new service (230.2(A)), the line side of the service disconnect (230.82(6)), or an extra service-entrance conductor set (230.40 Ex. 5).
The full lesson is in the Pro Version
Get the whole breakdown
- 4 more points on exactly what changed
- The 2020 rule next to the 2023 rule, side by side
- Why it changed
- What to do and check on the job
One membership unlocks every NEC® change lesson for 2020, 2023 and 2026, plus every video, quiz, flashcard and the Testing Center.
Checking your membership…
This section across NEC® editions
2020 NEC®New
New 705.11 covers tapping a power source in ahead of the service disconnect, with rules on output limits, conductor size, overcurrent protection, connections and ground-fault protection.
Open the 2020 page →2023 NEC®RevisedYou're here
Supply-side connections now list three allowed methods and treat the tap conductors as service conductors, with clear rules for sizing, splices, disconnects, bonding and overcurrent protection.
2026 NEC®Revised
Service connection rules were trimmed, Article 268 applies above 1000 volts, and length limits are back inside buildings: 10 ft at dwellings, 16.5 ft elsewhere, 66 ft with cable limiters.
Open the 2026 page →This is a plain-English summary, not the NEC®'s exact wording. Always check the full section in the NEC® edition your area has adopted, plus any local amendments.
NEC® and National Electrical Code® are registered trademarks of the National Fire Protection Association (NFPA). Electrical Exam Coach is not affiliated with or endorsed by NFPA.
Find it faster on test day