300.4 Protection from physical damage

RevisedChanged in the 2023 NEC® (from the 2020 NEC®)· Updated October 24, 2026

What changed in 300.4

Under metal roof decking, a new concrete exception was added and the RMC/IMC exception now depends on the fittings. Protective fittings for 4 AWG and larger go on before the pull.

Point by point

  • Under metal-corrugated roof decking, cables, raceways and boxes still need 1-1/2 inches of space below the deck, and no concealed wiring in that roof.

The full lesson is in the Pro Version

Get the whole breakdown

  • 3 more points on exactly what changed
  • The 2020 rule next to the 2023 rule, side by side
  • Why it changed
  • What to do and check on the job

One membership unlocks every NEC® change lesson for 2020, 2023 and 2026, plus every video, quiz, flashcard and the Testing Center.

Checking your membership…

This section across NEC® editions

2020 NEC®Revised

Where 4 AWG and larger conductors enter an enclosure from a raceway, a listed smooth-edged metal fitting now counts as protection, not just an insulating fitting.

Open the 2020 page →
2023 NEC®RevisedYou're here

Under metal roof decking, a new concrete exception was added and the RMC/IMC exception now depends on the fittings. Protective fittings for 4 AWG and larger go on before the pull.

2026 NEC®Revised

Found at 300.6 in the 2026 NEC®.

The roof decking rule now covers every roof deck type and all wiring methods, and the bushing on 4 AWG and larger can go on after the pull.

Open the 2026 page →

More 2023 changes in Article 300

This is a plain-English summary, not the NEC®'s exact wording. Always check the full section in the NEC® edition your area has adopted, plus any local amendments.

NEC® and National Electrical Code® are registered trademarks of the National Fire Protection Association (NFPA). Electrical Exam Coach is not affiliated with or endorsed by NFPA.